Build a Grade-Level Deck: Footings and Piers
Tips for forming piers, mixing concrete, and adding hardware to support deck posts
When you are building a deck, the first step is to install the footings. The most common type of footings for decks are concrete piers (another option that’s becoming more common are helical-pile footings) and there’s a lot to know just to get out of the ground. You’ll need to know if you need a spread base for your footings, how to dig the holes, how to mix the concrete, and what type of anchor bolts and post hardware to use and how to install them. In this video, host Justin Fink and builder Mike Guertin discuss all of these topics to help you get your deck off to a solid start. Once your footings are set up, move on to the next video in the series to learn how to install your ledger board, the next step in building a deck.
In this episode Mike will show how to:
- Use a garbage bag as an easy-to-install footing form
- Mix concrete to the correct consistency
- Align the footing forms to match the framing layout
- Secure and fill the forms so they don’t shift or crush
- Install bolts to secure the deck posts to the piers
Videos in the Series
-
Build a Grade-Level Deck
-
Build a Grade-Level Deck: Layout for Framing and Footings
-
Build a Grade-Level Deck: Footings and Piers
-
Build a Grade-Level Deck: Install a Ledger
-
Build a Grade-Level Deck: Install Posts and Rim Beam
-
Build a Grade-Level Deck: Joists and Hardware
-
Build a Grade-Level Deck: Stairs and Blocking
-
Build a Grade-Level Deck: Install Decking
-
Build a Bench and Half Wall for a Grade-Level Deck