going to look at a job that has cracking tile and grout popping out.
( over basement-wood floor-new addition)
My guess is that there is only 3/4″ plywood down for the subfloor.
Or poor workmanship.
Any past experiances with this problem?
Thanks
cc olmsted carpenters co.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Inspired by Larry Haun, this passionate framer is teaching a new generation of builders.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
No comments until you have a look at it and can report back as to what you have seen at site.
Could be a million things that could go wrong.
Check it out and let us know.
*The tile is loose. The tile has broken bond with the subfloor. As the least probability is inadequate subfloor support,I don't think the problem is consequent of this. If the tile was layed directly onto the wood with thinset you'll have a nice job for yourself--demo existing, install new over tile underlayment. If over concrete slab, there may be curing compounds in slab preventing bond. Or, perhaps the painter contaminated the slab with oil-base or solvent. Or, there is hydrodynamic head pressure coming up through on-grade slab.If over mud setting bed, the setting bed is cracking and the cracks are telegraphing through the tiles. This could be the result of insufficient material(cement) in the mud mix, insufficient setting bed thickness, or inadequate subfloor support.