FHB Logo Facebook LinkedIn Email Pinterest Twitter X Instagram Tiktok YouTube Plus Icon Close Icon Navigation Search Icon Navigation Search Icon Arrow Down Icon Video Guide Icon Article Guide Icon Modal Close Icon Guide Search Icon Skip to content
Subscribe
Log In
  • How-To
  • Design
  • Tools & Materials
  • Restoration
  • Videos
  • Blogs
  • Forum
  • Magazine
  • Members
  • FHB House
  • Podcast
Log In

Discussion Forum

Discussion Forum

CONCRETE FORMS FOR PIERS

Jake0358 | Posted in General Discussion on May 23, 2011 12:55pm

CONCRETE FORMS

For aesthetic reasons, I would like to use 12″x16″ piers for a porch, and that means no Sono tubes or 6×6 posts. The top of the piers are only going to be 19″ above grade with 42″ below grade. NOTE: Someone else has already dug out the old block footings that were set too shallow, so there is no hope of making nice new holes to help act as part of the form. I know I could use block, but my business is carpentry and I’ve never laid block before. Yeah, I could learn, but this is only for three piers and there isn’t enough money in the budget for me to hire a mason. Also, I thought pouring concrete would be the quickest and easiest way to go when it comes to getting the exact height and positioning that I want.

So my question is this: How should a form be framed for a 5’ pier?            

                                     3/4″ plywood and what type of exterior framing?

                                     2x4s or 2x6s? How should they be set and on what schedule?

I’m looking for advise from someone who has build forms in the past.

 

Thank you in advance.

Reply
  • X
  • facebook
  • linkedin
  • pinterest
  • email
  • add to favorites Log in or Sign up to save your favorite articles

Replies

  1. Yersmay1 | May 23, 2011 04:17am | #1

    concrete forms

    I'm a little confused by your question...  While you say you need forms for a 5' tall pier, you also say that only 19 inches of the pier is above grade.  Unless there is something I don't understand, whatever is below grade doesn't need a form because the earth itself will be your form.  At any rate, even a pier of 12 x 16 x 19 inches above grade will exert pressure at the bottom of the form so you want to be careful you've got it under control.  The pictures I've attached may be overkill but they will give you the idea and you can go from there.  First, a plywood box, screws about every six inches or so.  Then the horizontal walers,  2 x 4's on edge, screwed to the plywood.  The walers are pinned together at their perpendicular intersections at the corners of the box.  Then -- very important -- you install a vertical member to the outside edge of the walers and install kickers off of that vertical member.  Pay particular attention to having a kicker at the bottom of your pier because that is where you'll be more likely to have a blow out.  All sides of the form need to have kickers.  The kickers need to be staked off into the ground solidly or somehow wedged against something that make things completely stable.

    Will you have rebar inside?   You probably should but that's a whole other discussion.

    Don't forget to consolidate your concrete as you place it.  A vibrator would be great to have on hand but do some research on how to use it.  Don't forget to oil up your forms to make them easier to remove without pulling chunks of concrete away.  Don't forget to clean away any concrete at the very bottom outside edge of your form that might trap your form board and make it difficult to remove.  Unless there is some really, really good reason to remove the form and finish the concrete the day of the pour, it's a good idea to leave the forms intact for at least a couple of days before dismantaling them. 

    1. Jake0358 | May 23, 2011 07:56am | #2

      Concrete Forms

      Yersmay1,

      Thank you for your input and job site pictures.

      As noted in my OP, 16"x16" old block piers have already been dug out by someone else where the new piers are going to go; therefore, the hole is now way too large and "sloppy" to be useful to use as part of the form. Because of that, the form now needs to extend both below and above grade making the accumulated height of the form approximately 5'. As for rebar, in this area a 12" thick basement wall doesn't need rebar, and since the pier is only going to extend about 19" above grade and is going to be back filled on all sides, I didn't think rebar would be necessary at all.

      Further thoughts anyone?

      1. Yersmay1 | May 23, 2011 12:06pm | #4

        Further thoughts

        Well...  I don't know how 'sloppy' those holes are but they would need to be about two feet beyond your form to get a guy down there to be sure the bottom of the form is kicked off.   And a five foot column of wet concrete will blow your forms apart if they aren't kicked off and braced properly.  You'd also need to get a guy down there to dissassemble the forms when you're done.   This sounds like an awful lot of labor.  Have you calculated labor costs and how they would contrast to simply filling your existing holes with concrete and then forming up once you're above grade? 

        I'm also not so certain about backfilling against these piers all the way down. You'll never match the lateral strength of undisturbed earth really locking those piers into place. That may be something to think about especially because you don't plan to use rebar to give these piers lateral strrength.

        I have no idea of what these piers are meant to hold up, but erring on the side of caution is never a bad idea.  Is it possible to run all this by an engineer?  Two or three hundred bucks for a hour of the guy's time for a look/see can do wonders for a good night's sleep. 

      2. DaveRicheson | May 25, 2011 06:11am | #12

        Footings?

        Your original post does not mention footing under the 16x16" piers.

        If the piers are to be load bearing and poured in disturbed soil, you need an adequate footing under each pier. If the old block piers were setting on footing, then use it to set the new pier forms on. In both cases since you already have oversized holes dug, just dig more out to give you adequate room to set the pier forms or to pour a proper footing, then form.

        An alternative would be to dramatically increase the hole size to say 32" and pour a monolithic footing/pier to 8 or 10" below grade. Then set your 19" piers forms on top of the monolithic footing/pier.

        You need to know the load bearing capacity of your local soil to determin the footing size and rebar reguirements.

        1. Jake0358 | May 25, 2011 07:28am | #13

          Too much concrete

          Dave,

          I don’t think there is any footing there to speak of at all, and it makes no difference anyway. The old footings, if there is anything left there, are still too shallow for code. By the way, right now it is a caved in muddy hole where the old piers once were. Anything that is still there will have to be removed so that we can go deeper. The up side is that from the bottom of where the old piers sat will be a clean hole in undisturbed soil. As for making a 32" hole ... That would be a lot of concrete given the job size. This is a small job and it makes sense to simply mix the material right there by hand and fill block cells. If I keep it to 12"x16" block then that really isn’t much to mix. If I had a concrete truck coming, then I might go for the overkill pour because it really would not make much of a difference in the cost, but I don't see it in this situation.

          Thanks for your input.

          1. DanH | May 25, 2011 07:54am | #15

            Have you calculated how many bags of concrete mix a 12x16x60 inch pier will require?  I get 6 and 2/3rds cu ft.  Or 22.22 40-pound bags.

        2. DanH | May 25, 2011 07:48am | #14

          Dave, as he indicated originally, the original piers were too shallow and have been dug out.  He has to dig deeper to achieve the required footing depth.  Unless the porch deck is poured concrete or there's a large "bonus room" above it the 12x16 footprint should be more than adequate for a footing.

  2. DanH | May 23, 2011 07:58am | #3

    Be sure to plan how to get the form apart.  You can build the form outside the hole and drop it in, but you won't be able to reverse that to pull it apart.  Or plan so that you only need to remove the top part of the form.

    If your hole is not already down the 42 inches you don't need to build the form that tall if you can excavate the remaining depth while maintaing a reasonable hole shape.  (But of course ANY excavating at that depth is challenging.)

  3. [email protected] | May 23, 2011 12:24pm | #5

    Use CMU block and fill the cells

    In this instance I'd recommend using CMU blocks, and just using a construction adhesive instead of grout.  (You just need to hold them in place and not have them leak the wet concrete, until the concrete sets.)  I'd also recommend that you knock out about half the interior sides of the block to allow the concrete to flow between the cells. 

    Then drop a piece of number 4 rebar down each cell, and pour them full of concrete. 

    Back fill and you are done.   

    To set the final height I'd embed a suitable Simpson pier cap to the height you need, and pack under it after the concrete sets with nonshrink grout. 

    1. gfretwell | May 23, 2011 10:54pm | #6

      Jigs is on to something

      Pour a base at the bottom of the hole, trying to get a very flat surface "X" number of blocks down from your final height. poke those #4 or #5 rebars in the wet mud and let it set up. Then stack 12x16" CMUs in there, fill the cores and you are done

    2. Jake0358 | May 24, 2011 08:57am | #7

      CMU piers

      I hear you Jig. CMU was one of my initials thoughts, but then I thought about using forms to end up with a nice neat and clean looking monolithic concrete pier. The more I churn this all over in my mind with the help of you guys the more I don't see a concrete pier working out as much as I would like it to. The logistics appear too problematical for this situation and greatly outweigh the benefits. The cheap and easy way would be a Sonotube, but again, aesthetically, it isn’t my first choice, and I do care about how the finish product looks. All that said, I am leaning towards the filled CMU method with Jigs suggestion about using adhesive to hold the column in place. If needed, I can incorporate a cap using a form to tweak my elevation. As for the exterior of the CMU, perhaps a smooth sand stucco coat.

      1. gfretwell | May 24, 2011 11:05am | #8

        I doubt you even need the glue. Once you get the concrete in there they are not going anywhere and you will not have much squeeze out from stacked block. I set a stack of round column block under water and filled them with no problem. Even in the water, washout was minimal. 

        1. [email protected] | May 24, 2011 07:29pm | #9

          The glue is cheap insurance

          Construction adhesive is inexpensive and will assure that the block stay aligned, even when bumped.  The purpose isn't to keep the concrete from bleeding out the joints. 

          Nothing is worse than having the form blow out about the time you get all the concrete in. 

          So far as having minimal bleed out under water, you have to realize that the pressure from the water counteracts much of the pressure generated by the concrete.  Water weighs 122-lbs per cubic foot, and concrete weighs around 135 to 140-lbs per cubic foot.  The water around the form counteracts almost 90% of the pressure generated by the concrete. 

          1. gfretwell | May 24, 2011 09:32pm | #10

            We do a lot of concrete in cells and other places. Squeeze out is not really that big a deal if the gap is less than about 1/4". We have to pour the sides of window and door openings solid so I have done a lot of form work for this kind of thiing on renovations where you are adding a door or window. As long as you keep the concrete at a 4 or 5 slump it will stay there. If he starts with a flat pad on the bottom to create a good base, the stack of 12x16 block should be very stable, even before the concrete goes in.

            He could also make a hybrid column.Pour up this column of block up to the surface, then build forms above that and pour his solid concrete pier on top with MDF forms to get a slick clean surface. I do think it is easier to just go block all the way and parge it.

          2. Jake0358 | May 25, 2011 07:55am | #16

            The pad

            At this point my line of thinking is to set a starter block true and level in a bed of concrete with a short piece of rebar in each cell. Let it set up and build on it.

            As for the hybrid pier, it is a good thought but once I’m into the block I might was well just keep with that one method and parage.

            My only thoughts now are to build and fill the cells as I stack the block or simply stack all of the block and pour into the cells.

            Comments?

          3. DanH | May 25, 2011 08:18am | #17

            With a little bit of rebar you don't need to worry too much about avoiding voids -- a few won't matter.

            Do make sure you buy block that can be stacked in the arrangement you want and still keep the cores lined up reasonably well.

      2. DanH | May 24, 2011 09:57pm | #11

        I wonder if you couldn't use a large Sonotube for most of the height, and just form up the top the way you want it to appear?  It would be a little tricky with regard to frost heave, since unless you use a VERY large Sonotube there will be a lip that the frost can catch, but if you backfill the top portion with pea gravel that should minimize problems.

Log in or create an account to post a comment.

Sign up Log in

Become a member and get full access to FineHomebuilding.com

Video Shorts

Categories

  • Business
  • Code Questions
  • Construction Techniques
  • Energy, Heating & Insulation
  • General Discussion
  • Help/Work Wanted
  • Photo Gallery
  • Reader Classified
  • Tools for Home Building

Discussion Forum

Recent Posts and Replies

  • |
  • |
  • |
  • |
  • |
  • |
View More Create Post

Up Next

Video Shorts

Featured Story

Outdoor Lighting

Lighting up an exterior isn't just about ambiance— it's also about code compliance. Here is what the code says about safety and efficiency when it comes to outdoor lighting.

Featured Video

Micro-Adjust Deck-Baluster Spacing for an Eye-Deceiving Layout

No math, no measuring—just a simple jig made from an elastic band is all you need to lay out a good-looking deck railing.

Related Stories

  • Design and Build a Pergola
  • Podcast Episode 689: Basement Garages, Compact ERVs, and Safer Paint Stripper
  • FHB Podcast Segment: Are Single-Room ERVs the Answer?
  • Fire-Resistant Landscaping and Home Design Details

Highlights

Fine Homebuilding All Access
Fine Homebuilding Podcast
Tool Tech
Plus, get an extra 20% off with code GIFT20

"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.

Get home building tips, offers, and expert advice in your inbox

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters
See all newsletters

Fine Homebuilding Magazine

  • Issue 332 - July 2025
    • Custom Built-ins With Job-Site Tools
    • Fight House Fires Through Design
    • Making the Move to Multifamily
  • Issue 331 - June 2025
    • A More Resilient Roof
    • Tool Test: You Need a Drywall Sander
    • Ducted vs. Ductless Heat Pumps
  • Issue 330 - April/May 2025
    • Deck Details for Durability
    • FAQs on HPWHs
    • 10 Tips for a Long-Lasting Paint Job
  • Issue 329 - Feb/Mar 2025
    • Smart Foundation for a Small Addition
    • A Kominka Comes West
    • Making Small Kitchens Work
  • Issue 328 - Dec/Jan 2024
    • How a Pro Replaces Columns
    • Passive House 3.0
    • Tool Test: Compact Line Lasers

Fine Home Building

Newsletter Sign-up

  • Fine Homebuilding

    Home building tips, offers, and expert advice in your inbox.

  • Green Building Advisor

    Building science and energy efficiency advice, plus special offers, in your inbox.

  • Old House Journal

    Repair, renovation, and restoration tips, plus special offers, in your inbox.

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters

Follow

  • Fine Homebuilding

    Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.

    Start Free Trial Now
    • Facebook
    • Instagram
    • X
    • LinkedIn
  • GBA Prime

    Get instant access to the latest developments in green building, research, and reports from the field.

    Start Free Trial Now
    • Facebook
    • YouTube
  • Old House Journal

    Learn how to restore, repair, update, and decorate your home.

    Subscribe Now
    • Facebook
    • Instagram
    • X
  • Fine Homebuilding

    Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.

    Start Free Trial Now
    • Facebook
    • Instagram
    • X
    • LinkedIn
  • GBA Prime

    Get instant access to the latest developments in green building, research, and reports from the field.

    Start Free Trial Now
    • Facebook
    • YouTube
  • Old House Journal

    Learn how to restore, repair, update, and decorate your home.

    Subscribe Now
    • Facebook
    • Instagram
    • X

Membership & Magazine

  • Online Archive
  • Start Free Trial
  • Magazine Subscription
  • Magazine Renewal
  • Gift a Subscription
  • Customer Support
  • Privacy Preferences
  • About
  • Contact
  • Advertise
  • Careers
  • Terms of Use
  • Site Map
  • Do not sell or share my information
  • Privacy Policy
  • Accessibility
  • California Privacy Rights

© 2025 Active Interest Media. All rights reserved.

Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.

  • Home Group
  • Antique Trader
  • Arts & Crafts Homes
  • Bank Note Reporter
  • Cabin Life
  • Cuisine at Home
  • Fine Gardening
  • Fine Woodworking
  • Green Building Advisor
  • Garden Gate
  • Horticulture
  • Keep Craft Alive
  • Log Home Living
  • Military Trader/Vehicles
  • Numismatic News
  • Numismaster
  • Old Cars Weekly
  • Old House Journal
  • Period Homes
  • Popular Woodworking
  • Script
  • ShopNotes
  • Sports Collectors Digest
  • Threads
  • Timber Home Living
  • Traditional Building
  • Woodsmith
  • World Coin News
  • Writer's Digest
Active Interest Media logo
X
X
This is a dialog window which overlays the main content of the page. The modal window is a 'site map' of the most critical areas of the site. Pressing the Escape (ESC) button will close the modal and bring you back to where you were on the page.

Main Menu

  • How-To
  • Design
  • Tools & Materials
  • Video
  • Blogs
  • Forum
  • Project Guides
  • Reader Projects
  • Magazine
  • Members
  • FHB House

Podcasts

  • FHB Podcast
  • ProTalk

Webinars

  • Upcoming and On-Demand

Podcasts

  • FHB Podcast
  • ProTalk

Webinars

  • Upcoming and On-Demand

Popular Topics

  • Kitchens
  • Business
  • Bedrooms
  • Roofs
  • Architecture and Design
  • Green Building
  • Decks
  • Framing
  • Safety
  • Remodeling
  • Bathrooms
  • Windows
  • Tilework
  • Ceilings
  • HVAC

Magazine

  • Current Issue
  • Past Issues
  • Magazine Index
  • Subscribe
  • Online Archive
  • Author Guidelines

All Access

  • Member Home
  • Start Free Trial
  • Gift Membership

Online Learning

  • Courses
  • Project Guides
  • Reader Projects
  • Podcast

More

  • FHB Ambassadors
  • FHB House
  • Customer Support

Account

  • Log In
  • Join

Newsletter

Get home building tips, offers, and expert advice in your inbox

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters
See all newsletters

Follow

  • X
  • YouTube
  • instagram
  • facebook
  • pinterest
  • Tiktok

Join All Access

Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.

Start Your Free Trial

Subscribe

FHB Magazine

Start your subscription today and save up to 70%

Subscribe

Enjoy unlimited access to Fine Homebuilding. Join Now

Already a member? Log in

We hope you’ve enjoyed your free articles. To keep reading, become a member today.

Get complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.

Start your FREE trial

Already a member? Log in

Privacy Policy Update

We use cookies, pixels, script and other tracking technologies to analyze and improve our service, to improve and personalize content, and for advertising to you. We also share information about your use of our site with third-party social media, advertising and analytics partners. You can view our Privacy Policy here and our Terms of Use here.

Cookies

Analytics

These cookies help us track site metrics to improve our sites and provide a better user experience.

Advertising/Social Media

These cookies are used to serve advertisements aligned with your interests.

Essential

These cookies are required to provide basic functions like page navigation and access to secure areas of the website.

Delete My Data

Delete all cookies and associated data