Hi,We have a 9 x 8 concrete pad 4 inches deep that we are extending 1 ft on one side and 18 inches on the other side. Do we need to put any type of joint material between the old concrete and the new concrete? Thanks, Danielle
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story

These defensive details give homes a better chances of surviving wildfires.
Featured Video
Video: Build a Fireplace, Brick by BrickHighlights
Fine Homebuilding Magazine
- Home Group
- Antique Trader
- Arts & Crafts Homes
- Bank Note Reporter
- Cabin Life
- Cuisine at Home
- Fine Gardening
- Fine Woodworking
- Green Building Advisor
- Garden Gate
- Horticulture
- Keep Craft Alive
- Log Home Living
- Military Trader/Vehicles
- Numismatic News
- Numismaster
- Old Cars Weekly
- Old House Journal
- Period Homes
- Popular Woodworking
- Script
- ShopNotes
- Sports Collectors Digest
- Threads
- Timber Home Living
- Traditional Building
- Woodsmith
- World Coin News
- Writer's Digest
Replies
Dowels
Add some dowels to lock the surfaces together if a level pad is important.
You should really give us some more to work with.
You should probably let us know know why, you are doing this. And, the layout.
Yes, if you wan t it to stay attached