This photo illustrates a technique I devised to compensate for poorly installed ODE roof flashing. ALL fascia boards (rotten) were replaced with new, primed and painted boards. Each board received a kerf cut into which I slipped L-shaped metal. The top edge of this metal was slipped under the existing ODE (overhand drip edge…it should have been GA gutter apron…sigh). I caulked the kerf with Lexel brand glue-caulk, and applied a final coat of paint.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
FHB Podcast team chats about adding Larsen trusses to an existing stud-frame home with no additional sheathing.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.