I was asked by one of my general contractors to provide materials and installation for a medallion that his client was given a quote of $6500.00 to produce not including installation or finishing. I told him that I could produce it for a maximum charge of $3000.00 or $100.00/hour plus materials, whichever is less. I setup the pictures for this post so that one could see the process that I am going through. This is the current overview picture; 5″ wide radius with 2 1/4″ wide materials for the quadrants. Common grade American Cherry. There is 2000 sf of 5″ Common American Cherry flooring along with this medallion. GW
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
The FHB Podcast team weighs in on Building Science career questions.
Featured Video
SawStop's Portable Tablesaw is Bigger and Better Than BeforeHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
This next picture shows how to install the quadrants of 2 1/4 material. After all of the lines are drawn inside the radius to designate where all of the elements are to go, I just scribe in the flooring to the radius and let it run long past its stopping point. Then I transfer the lines on top of the over run pieces and then just saw off the excess with a circular saw. It is important to leave the last cut of the quadrant off so that the saw does not cut the radius section. Then just cut that last piece to fit perfectly. This medallion will get four pieces of 5" wide flooring inserted in between the quadrants all mitering at the intersection.
*I see no rosin paper. Are you using adhesive?Will the quad lines be another material like mohagony for contrast?
*No paper or glue under the quadrants, Liquid nails under the radius as well as under the cross members when they get installed. The quads are 2 1/4 wide and the ply is at 8% moisture, so movement will be at a minimum. I may not install the cross members until later to allow the quads to expand if necessary, since everything is butt fitted.
*Cool greg:Keep the pics coming! It's always a challenge to do that type of work on site instead of just "popping" in a prefab medallion. I can't say I've done one that large on site.While we're in the gallery, it made me think of some impressive prefab pieces, borders and so forth. The sky is the limit if one wants to spend bookoo bucks for anything custom and entirely one of a kind.http://www.historicfloors.com/
*One of the biggest challenges has got to be traffffic from other subs while you are working in that space
*Historic was the company that bid the medallion at 6500.00. I'm the only contractor in the house right now. This builder always sets it up that way.
*Two pictures of the completed medallion, rough sanded and ready for billing. Total labor cost will be $2,200.00 plus 300.00 for quadrant materials. 22 hours labor to install medallion, cut flooring into the radius on two sides and rough sand. GW
*Looks great! Greg- Do you have to make a special threshold for the door plus trim at baseboard or does someone else do that?Bob
*The finish carpenters do the trim. Thanks for the compliment. GW
*Greg,I like your piece at the entry. But...I don't normally see flooring as wide as was used down through the hall. Would it be possible that a narrower plank would look better for small spaces like that? Naturally, I can't see the rest of the place so I have to assume that larger rooms are adjacent that tie it together....Any comments?
*Larger rooms that tie it together.1600 sf.
*Greg: That really looks sharp. Nice work.