*
I think I messed up. I laid 12″ ceramic tiles directly on my 3/4 inch plywood subfloor; the joists are 16″o/c. It’s a high traffic area but the only furniture that’s on the floor (or likely ever will be) is two barstools. So far, a year later, it hasn’t buckled but I’m wondering if I ought to access the subfloor from the basement (it’s an open ceiling) and screw some additional plywood sheets to the floor from below, between the joists. will this help prevent sagging in the future? is it necessary?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story

Join some of the most experienced and recognized building professionals for two days of presentations, panel discussions, networking, and more.
Highlights
Fine Homebuilding Magazine
- Home Group
- Antique Trader
- Arts & Crafts Homes
- Bank Note Reporter
- Cabin Life
- Cuisine at Home
- Fine Gardening
- Fine Woodworking
- Green Building Advisor
- Garden Gate
- Horticulture
- Keep Craft Alive
- Log Home Living
- Military Trader/Vehicles
- Numismatic News
- Numismaster
- Old Cars Weekly
- Old House Journal
- Period Homes
- Popular Woodworking
- Script
- ShopNotes
- Sports Collectors Digest
- Threads
- Timber Home Living
- Traditional Building
- Woodsmith
- World Coin News
- Writer's Digest
Replies
*
I would just leave it alone until it needs fixing. I don't know if the additional plywood would help.
I did the same thing in my cabin five years ago and I only have one cracked tile .
Dave
*
I think I messed up. I laid 12" ceramic tiles directly on my 3/4 inch plywood subfloor; the joists are 16"o/c. It's a high traffic area but the only furniture that's on the floor (or likely ever will be) is two barstools. So far, a year later, it hasn't buckled but I'm wondering if I ought to access the subfloor from the basement (it's an open ceiling) and screw some additional plywood sheets to the floor from below, between the joists. will this help prevent sagging in the future? is it necessary?