From Dirt To Dreamhouse In 7 Minutes (Timelapse) With Walkthrough Move-In Tour
12 months in 7 minutes. first half of video (7 minutes) is time-lapse construction. second half (7 minutes) is complete tour upon completion.
https://youtu.be/KLhuH9eVI_s?si=qVpZd7_KLmVqGrR2
Plans were drawn up by homeowner, on a MacBook using the “Pages” word processor program. She had no experience in drafting or architecture, just a vision and a dream.
2023 construction. 3Bdr/2Ba w/ basement & 2 car attached garage.
Active Homesteaders, built home for off-grid living. Primary heating: 3 wood stoves, one is a built-in cookstove/oven in the kitchen. There is a second, modern, propane oven supplied by a 250 gallon storage tank. 80 gallon heat pump water heater. Two EG4 dual input AC 120v / 90VDC-380VDC 1000-1600W Mini-Split HVAC units. Grundfoss 10 high efficiency deep water well pump. spray foam insulation.
Solar System is a Sol-Ark 12k 48V charge controller, 14,400Wh storage with 2440W Array. PV Array expansion and battery upgrades are in-process.
Home sits on 10 acres approximately 650’×720′