Shot a couple more pics today, we are finally getting underway again on this theater.
http://img.photobucket.com/albums/v648/Mntngoat/DSC00463.jpg
http://img.photobucket.com/albums/v648/Mntngoat/DSC00464.jpg
http://img.photobucket.com/albums/v648/Mntngoat/DSC00466.jpg
http://img.photobucket.com/albums/v648/Mntngoat/DSC00467.jpg
ML
Replies
You couldn't perhaps move the photos into position and maybe explain the first one.
thanks.
A Great Place for Information, Comraderie, and a Sucker Punch.
Remodeling Contractor just outside the Glass City.
http://www.quittintime.com/
First one is the "dancefloor" scaffolding set up to access the access 38' above the floor. We preinstallled the wires before the roof deck was poured. Viewed from the projection port on the 3rd level.Concourse level corridor
Other end Of Concourse
Concourse entryOne more of the entry
http://img.photobucket.com/albums/v648/Mntngoat/DSC00461.jpgML
Edited 11/5/2008 7:59 pm by MSLiechty
Rotated.View ImageView ImageView ImageView Image
Jon Blakemore
RappahannockINC.com Fredericksburg, VA
Are those arches pre-cast. It almost looks like there is vinyl or something on them.
Mike
Small wheel turn by the fire and rod, big wheel turn by the grace of god.
Steel stud and multiple layers of 1/4" drywall, The vinyl you see is the flex corner bead.ML