How do you go about laying oak strip flooring over a concrete slab? Can I put a plywood subfloor over the slab and then go over that with the strip flooring? Many thanks.
T2
Listeners write in about shower panels and cordless tools and ask questions about old wiring, air leaks, and gutter covers.
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Get home building tips, offers, and expert advice in your inbox
Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.
Start Free Trial NowGet instant access to the latest developments in green building, research, and reports from the field.
Start Free Trial NowDig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.
Start Free Trial NowGet instant access to the latest developments in green building, research, and reports from the field.
Start Free Trial Now© 2025 Active Interest Media. All rights reserved.
Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.
Get home building tips, offers, and expert advice in your inbox
Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.
Start Your Free TrialGet complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.
Already a member? Log in
We use cookies, pixels, script and other tracking technologies to analyze and improve our service, to improve and personalize content, and for advertising to you. We also share information about your use of our site with third-party social media, advertising and analytics partners. You can view our Privacy Policy here and our Terms of Use here.
Replies
That works, since you can nail to the ply. Or you can glue the oak directly to the slab, if it is engineered wood (aka plywood).
Do it right, or do it twice.
Is 3/4" ply enough of a subfloor or will it require more?
ELCID
Do you need to put a vapor barrier between the slab and the ply? and also between the ply and the oak?
Doug
I don't know , do I?
Here is a link to NOFMA (NOFMA: The Wood Flooring Manufacturers Association)
http://www.nofma.org/installation2.htm
Coldbond mastic skim coated over concrete. Broom 6 mil plastic over skim coat. Apply 1/4 x 1/4 x 1/4 coldbond mastic to plastic. Lay minimum 5/8 CDX into glue. Nail with 1 1/4" concrete nails 10" on center, 1 1/2" nails for 3/4 cdx. Plywood needs to be below 10% moisture content. Stay away from HD. Go to a lumber yard that houses their ply inside. The lower the moisture level the better. Sand plywood joints level, lay out 15 lb. felt and then nail the floor. GW
Thanks Greg