We are installing a Toyotomi OM128 to 3 Toyotomi Convector HC20 Units. The lines going to the units will be pex with glycol. But the fittings from the OM 128 to expansion tank and circulating pump and all fittings are black iron. I was told after installing half the fittings that I was supposed to use brass or copper fittings or else the fittings will rust. This is a closed loop heating system. Do I need to change fittings before I finish install?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
We found the brightest, best-performing green laser in a head-to-head test of eight popular models.
Featured Video
A Modern California Home Wrapped in Rockwool Insulation for Energy Efficiency and Fire ResistanceRelated Stories
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.