ineptphilosopher | Posted in Business on October 5, 2006 11:05am

hello my name is inepthilosopher from the Denver area and I am trying to put together my pricing detail for finish carpentry. For instance what should I charge as a base rate per pre hung door, per ft or per joint or cut for base, crown, casing???

Is there a good rule for estamating build in cabinetry. Thus far I have been estamating on how much time I think it will take me plus material to arive at my final price. Am I unsofisticated?? (sp)

Reply
  • X
  • facebook
  • linkedin
  • pinterest
  • email
  • add to favorites Log in or Sign up to save your favorite articles

Replies

  1. User avater
    jonblakemore | Oct 05, 2006 11:47pm | #1

    Your method should work fine, and ultimately the number you get by figuring the amount of hours is the number you want to come up with. It doesn't really cost you anything to install x feet of baseboard, the real cost is the fact that it takes you y hours to complete the task.

    Many will say you shouldn't estimate by the LF or unit because it's too inaccurate. Unfortunately, you may be forced to if you want to work for some builders. If that's the case, do your best to figure out how long an average project will take you (whether it be basement, addition, or new home) and the divide the number of feet by the number of hours you project. The hard part is you can run into conditions that will slow you down more on some jobs than others, so you have to anticipate that as much as possible with your estimate of your rate of production.

     

    Jon Blakemore

    RappahannockINC.com Fredericksburg, VA

    1. Piffin | Oct 05, 2006 11:55pm | #3

      I use number of feet but upcharge for additional corners or cuts. 

       

      Welcome to the Taunton University of Knowledge FHB Campus at Breaktime. where ... Excellence is its own reward!

  2. Piffin | Oct 05, 2006 11:49pm | #2

    yes, you are unsophisticated, especially for a philosopher.
    But you are on the right track.

    Do job costing so that you know how much it actually takes to hang a door or how many feet of crown or of base or casing you can run in a day, on the average.
    Then add for your overhead and profit when estimating.

     

     

    Welcome to the
    Taunton University of
    Knowledge FHB Campus at Breaktime.
     where ...
    Excellence is its own reward!

  3. Electroman | Oct 06, 2006 12:00am | #4

    ...not "unsofistocated" but very sophistocated IMHO.  We bid electrical work on the premise of how long a job will take, not per linear foot of wire.  25,000' of wire I can install in two hours if I have a reasonable helper or two and the conduit is already run and on a rack and the runs are fairly long.  If I'm building a set of PLC cabinets for a power plant, 25,000 ft of wire might take a couple of months.

    I would think with trim carp. esp. one would want to look at the job first and leave some margin for error. For instance, a job on the 12th floor of an office building in downtown denver will be much harder to get into and out of than a suburban tract home that is vaccant.

     

    Just my two cents.

     

    Chris

  4. JerraldHayes | Oct 06, 2006 01:28am | #5

    ineptphilosopher- " Is there a good rule for estamating build in cabinetry. Thus far I have been estamating on how much time I think it will take me plus material to arive at my final price. Am I unsofisticated?? (sp)"

    No, actually provided you have the correct Loaded Labor Rate in place and are relatively accurate at estimating the Effort (time) involved with certain tasks you pretty much have the right idea about how to estimate anything. I say pretty much in that while you are billing for the materials you are installing the way you've described things it sounds like you are just getting reimbursed for their cost and not making any kind of Net Profit on them. I would mark up materials (as well as any subcontracting) up to earn a Net Profit on those costs too.

    Your formula for pricing a project would then look like this:

    (Labor_Hrs_Required X Loaded_Labor_Rate*) + (Material_Costs X NetProfit_Markup) + (SubContractingl_Costs X NetProfit_Markup) =Job Price

    (note*- The Loaded Labor Rate already has NetProfit_Markup applied to it so that's why it doesn't appear in the formula)

    That still leaves you with two big issues you have to get right in order for all this to work.

    1. You have to get the correct Loaded Labor Rate and...
    2. You have to relatively accurately estimate how long the typical finish carpentry tasks will take you.

    As for understanding how to set the correct Loaded Labor Rate I would like to suggest you pick up Ellen Rohr's How Much Should I Charge?: Pricing Basics for Making Money Doing What You LoveView Image (and getting her book Where Did The Money Go?- Easy Accounting Basics for the Business Owner Who Hates Numbers View Imageat the same time wouldn't be a bad idea at all too).

    Then if you're looking for a tool to help you set that rate and happen to have MS Excel you can download freeware Capacity Based Markup Worksheet (aka the " PILAO" Worksheet) from one of my sites. Plug in your budget values for the Variable and Fixed Overhead items and the Net Profit you want to earn and it will generate a Loaded Labor Rate for you. If you have any trouble with it you can call me at the number on the web site and I'll be glad to talk you through it.

    As for number two up there "accurately estimating how long the typical finish carpentry tasks will take" that's not so cut and dried or easy. There are some people out their who have a pretty good intuitive sense for figuring how longs tasks will take but in most cases that is still a difficult and sometimes risky task. There is still no real clear cut solution for someone just starting out but the estimating manuals that are out there that publish labor times for tasks are a place you can start to get going in developing you own personal list. However it's a good thing to remember two more things:

    1. Each estimator uses the labor unit to his or her own

      interpretation of its meaning. The units are standard

      as to listing but individual as to interpretation. (in other words I might have a figure of .800 labor hours to install a prehung door and define that as just installing the prehung door whereas another estimator might interpret that to mean installing the prehung door along with the lockset and trim. So you have to figure out just what the data means and then define it again for your own use.) And...

    2. The Golden Rule of Construction Cost Estimating: Consider not only the cubic foot, cubic yard, lineal foot, square foot, pound or ton but all of the complicating conditions encountered in putting the materials in place. In other words while we may figure a typical prehung door installation to take .800 labor hours that doesn't mean that all the prehung door installations we do are going to be typical. You need to consider things like how easy is it to get the door from where it is stored to where it is going to be installed, does the door need to be modified (cut down) before it is installed etc. etc.

      So what you would do is then use your average typical installation figure as a benchmark and then estimate the effort or time the complicating conditions will take and add them in. That way you are not looking at every item you need to estimate as if it was something you have never done before. You can use your own productivity history and spend your estimating time thinking about and estimating the complicating conditions.

    You might also want to read this old post of mine from back in 2003 where I describe some of the things we think of and consider when coming up with our finish woodworking estimates: interior trim bid.


    View Image

    1. ineptphilosopher | Oct 07, 2006 12:00am | #11

      Wow !!! thank you so much for all your input especially Jarreld Hays (I will not call you mister) It has been very helpful. My wife Carrie and I are going out of town for a few days and I will be reviewing all these suggestions on our trip. Upon return I will have about 6 hundred more questions for you all. your sugestions have been helpful in encourageing me to work harder to "cross the line" from trades to trades business. More on that later. Ineptphilosopher.

  5. Jer | Oct 06, 2006 02:15am | #6

    All the advice here is goo.  I've never really done it any other way than what you are saying. Piffin said it right. I figure what I can do in a day, do a markup on material and any hired labor, and then mark what your profit will be.  Mind you, profit is not the money you pay yourself as salery. 

    Each person's intuition is different and mine is not that great (along with many of my fellow tradesmen).  I usually figure what I think I can do in a certain period of time at a given rate per hour (what I really want to make and think is fair), then I double it, then add in the material and any extras.  More often than not that figure comes in right on.

    Trim carpentry estimating comes with experience.  You know what you can accomplish in a day after years of doing it. 

    I do a lot of repair and restoration so many times I'm on T&M.

    1. JerraldHayes | Oct 06, 2006 02:29am | #7

      From: Jer - "...Mind you, profit is not the money you pay yourself as salary."

      Thanks for saying that Jer. That is a real good point that I should have said and emphasized in my post but somehow overlooked.

      And on the subject of working T&M ....when you are working T&M jobs are you recording what you doing and developing you own set of task times? When your intuitions isn't so great (and even when it is pretty good) developing estimating data you can use in the future for fixed price bids is one of the real benefits of getting a T&M job. Unfortunately many, if not most, contractors just ignore that and come out of T&M jobs with nothing they can use.

      View Image

      1. calvin | Oct 06, 2006 03:55am | #8

        Remember when you figure an estimate that set up, layout and job logistics are a very important part of the per foot cost or per job number.

        Once you set up a cut station and stock material, you can run alot of trim in a day.  However, the same set up appears whether you are casing a door or triming several rooms.  Set up of one cabinet end panel can be done once and repeated on several cabinets........or one.

        Another important thing to remember in figuring costs are job site logistics.  Are you cutting in or out.  Are the rooms big enough to cut the lengths you are working with. 

        There's more to it than first appears.A great place for Information, Comraderie, and a sucker punch.

        Remodeling Contractor just outside the Glass City.

        Quittin' Time

         

      2. Jer | Oct 06, 2006 04:08am | #9

        "....when you are working T&M jobs are you recording what you doing and developing you own set of task times"

         

        To a degree , yes I do.  I always walk away at the end of T&M jobs with a time record of what I have done.  I don't keep close tabs on it though and I know that I should for future reference.  For instance how long a particular task really took me as opposed to how long I think I would take.  I have some of the more common ones marked down in a little booklet, but  most of the stuff is in my head. 

          T&M work for me mostly involves sight unseen stuff, ie. rot, labor intensive stuff and tip of the iceberg stuff, so each job is a unique thing and usually takes on a life of its own, not giving much over to any kind of regulated time stand.  I would say the 50% of my work is T&M.

        A lot of T&M along with T&E, (time and experience), has allowed me to come out ahead these days on estimated jobs. 

         

  6. jeffwoodwork | Oct 06, 2006 09:02am | #10

    Did the other kids make fun of you growing up with that name?  You can bid piece work but that just boils down to" I can hang and trim a door in 30 minutes so at $50/hr.. that's $25/door".  Pick a number that covers your wage, overhead, PTO, 401K or SEP and on and on.  Like $50/hour or $400 a day.  If you do materials add 10%.

    1. ineptphilosopher | Oct 07, 2006 12:02am | #12

      yes the other kids did make fun of me for having a name like ineptphilosopher but it made me stronger....just like the song "a boy named sue." My Daddy knew what he was doing. Thanks much for your sugestions. Inepephilosopher

Log in or create an account to post a comment.

Sign up Log in

Become a member and get full access to FineHomebuilding.com

Video Shorts

Categories

  • Business
  • Code Questions
  • Construction Techniques
  • Energy, Heating & Insulation
  • General Discussion
  • Help/Work Wanted
  • Photo Gallery
  • Reader Classified
  • Tools for Home Building

Discussion Forum

Recent Posts and Replies

  • |
  • |
  • |
  • |
  • |
  • |
View More Create Post

Up Next

Video Shorts

Featured Story

Picture-Perfect Pergola

Built from locally sawn hemlock, this functional outdoor feature uses structural screws and metal connectors for fast, sturdy construction.

Featured Video

Video: Build a Fireplace, Brick by Brick

Watch mason Mike Mehaffey construct a traditional-style fireplace that burns well and meets current building codes.

Related Stories

  • Design and Build a Pergola
  • Podcast Episode 689: Basement Garages, Compact ERVs, and Safer Paint Stripper
  • FHB Podcast Segment: Are Single-Room ERVs the Answer?
  • Fire-Resistant Landscaping and Home Design Details

Highlights

Fine Homebuilding All Access
Fine Homebuilding Podcast
Tool Tech
Plus, get an extra 20% off with code GIFT20

"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.

Get home building tips, offers, and expert advice in your inbox

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters
See all newsletters

Fine Homebuilding Magazine

  • Issue 332 - July 2025
    • Custom Built-ins With Job-Site Tools
    • Fight House Fires Through Design
    • Making the Move to Multifamily
  • Issue 331 - June 2025
    • A More Resilient Roof
    • Tool Test: You Need a Drywall Sander
    • Ducted vs. Ductless Heat Pumps
  • Issue 330 - April/May 2025
    • Deck Details for Durability
    • FAQs on HPWHs
    • 10 Tips for a Long-Lasting Paint Job
  • Issue 329 - Feb/Mar 2025
    • Smart Foundation for a Small Addition
    • A Kominka Comes West
    • Making Small Kitchens Work
  • Issue 328 - Dec/Jan 2024
    • How a Pro Replaces Columns
    • Passive House 3.0
    • Tool Test: Compact Line Lasers

Fine Home Building

Newsletter Sign-up

  • Fine Homebuilding

    Home building tips, offers, and expert advice in your inbox.

  • Green Building Advisor

    Building science and energy efficiency advice, plus special offers, in your inbox.

  • Old House Journal

    Repair, renovation, and restoration tips, plus special offers, in your inbox.

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters

Follow

  • Fine Homebuilding

    Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.

    Start Free Trial Now
    • Facebook
    • Instagram
    • X
    • LinkedIn
  • GBA Prime

    Get instant access to the latest developments in green building, research, and reports from the field.

    Start Free Trial Now
    • Facebook
    • YouTube
  • Old House Journal

    Learn how to restore, repair, update, and decorate your home.

    Subscribe Now
    • Facebook
    • Instagram
    • X
  • Fine Homebuilding

    Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.

    Start Free Trial Now
    • Facebook
    • Instagram
    • X
    • LinkedIn
  • GBA Prime

    Get instant access to the latest developments in green building, research, and reports from the field.

    Start Free Trial Now
    • Facebook
    • YouTube
  • Old House Journal

    Learn how to restore, repair, update, and decorate your home.

    Subscribe Now
    • Facebook
    • Instagram
    • X

Membership & Magazine

  • Online Archive
  • Start Free Trial
  • Magazine Subscription
  • Magazine Renewal
  • Gift a Subscription
  • Customer Support
  • Privacy Preferences
  • About
  • Contact
  • Advertise
  • Careers
  • Terms of Use
  • Site Map
  • Do not sell or share my information
  • Privacy Policy
  • Accessibility
  • California Privacy Rights

© 2025 Active Interest Media. All rights reserved.

Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.

  • Home Group
  • Antique Trader
  • Arts & Crafts Homes
  • Bank Note Reporter
  • Cabin Life
  • Cuisine at Home
  • Fine Gardening
  • Fine Woodworking
  • Green Building Advisor
  • Garden Gate
  • Horticulture
  • Keep Craft Alive
  • Log Home Living
  • Military Trader/Vehicles
  • Numismatic News
  • Numismaster
  • Old Cars Weekly
  • Old House Journal
  • Period Homes
  • Popular Woodworking
  • Script
  • ShopNotes
  • Sports Collectors Digest
  • Threads
  • Timber Home Living
  • Traditional Building
  • Woodsmith
  • World Coin News
  • Writer's Digest
Active Interest Media logo
X
X
This is a dialog window which overlays the main content of the page. The modal window is a 'site map' of the most critical areas of the site. Pressing the Escape (ESC) button will close the modal and bring you back to where you were on the page.

Main Menu

  • How-To
  • Design
  • Tools & Materials
  • Video
  • Blogs
  • Forum
  • Project Guides
  • Reader Projects
  • Magazine
  • Members
  • FHB House

Podcasts

  • FHB Podcast
  • ProTalk

Webinars

  • Upcoming and On-Demand

Podcasts

  • FHB Podcast
  • ProTalk

Webinars

  • Upcoming and On-Demand

Popular Topics

  • Kitchens
  • Business
  • Bedrooms
  • Roofs
  • Architecture and Design
  • Green Building
  • Decks
  • Framing
  • Safety
  • Remodeling
  • Bathrooms
  • Windows
  • Tilework
  • Ceilings
  • HVAC

Magazine

  • Current Issue
  • Past Issues
  • Magazine Index
  • Subscribe
  • Online Archive
  • Author Guidelines

All Access

  • Member Home
  • Start Free Trial
  • Gift Membership

Online Learning

  • Courses
  • Project Guides
  • Reader Projects
  • Podcast

More

  • FHB Ambassadors
  • FHB House
  • Customer Support

Account

  • Log In
  • Join

Newsletter

Get home building tips, offers, and expert advice in your inbox

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters
See all newsletters

Follow

  • X
  • YouTube
  • instagram
  • facebook
  • pinterest
  • Tiktok

Join All Access

Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.

Start Your Free Trial

Subscribe

FHB Magazine

Start your subscription today and save up to 70%

Subscribe

Enjoy unlimited access to Fine Homebuilding. Join Now

Already a member? Log in

We hope you’ve enjoyed your free articles. To keep reading, become a member today.

Get complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.

Start your FREE trial

Already a member? Log in

Privacy Policy Update

We use cookies, pixels, script and other tracking technologies to analyze and improve our service, to improve and personalize content, and for advertising to you. We also share information about your use of our site with third-party social media, advertising and analytics partners. You can view our Privacy Policy here and our Terms of Use here.

Cookies

Analytics

These cookies help us track site metrics to improve our sites and provide a better user experience.

Advertising/Social Media

These cookies are used to serve advertisements aligned with your interests.

Essential

These cookies are required to provide basic functions like page navigation and access to secure areas of the website.

Delete My Data

Delete all cookies and associated data