I want to seal the metal air ducts in my crawl space with mastic. Can I run my A/C right after I’ve applied the mastic? It’s summer in North Carolina and I’m not sure how long I can go without running the A/C.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Upgrading the footings and columns that support a girder beam is an opportunity to level out the floor above.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
I'd let it dry for at least 4 hours before running the AC.