I have a bathroom that has a subfloor of 1/2″ and that transitions to a hallway that has 3/4″ hardwood over that same 1/2″ subfloor. If I intend to install vinyl plank flooring in the bathroom what should go over the subfloor? Should I add an additional layer of 1/2″ subfloor and then a 1/4″ layer of underlayment, and what would be the nail or screw schedule for installing this to the subfloor beneath it? to clarify I would like the Hardwood flooring and vinyl plank flooring to be even with one another.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
The RealTruck AMP Research Bedsteps give you easy access to your truck-bed storage.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
If your vinyl plank is 1/4” (+/-) and you want it to be flush. You will install one layer of 1/2”. I would screw the existing 1/2” layer to the joist really well first and glue/screw a new layer of 1/2” good quality plywood on that. I would screw about every 6” and make sure to stagger plywood seams, so you don’t have seams of existing 1/2” and new 1/2” in same area. If the new floor is slightly lower or higher it won’t be noticeable as you will need to have a floor transition where the floors meet anyway. The vinyl plank can’t be installed tight to the wood floor as it is a floating floor. If you are installing a thin glue/stick down type flooring, you’ll need a layer of approved flooring underlayment to keep imperfections in subfloor from transferring through to the vinyl plank. The approved underlayment is a plywood that is thin (around 1/8”) and manufacturers usually suggest using a finish stapler to fasten it to the floor (no glue). You will still need to install the 1/2” with the glue down for strength as well.
J,
Armstrong’s and others approved underlay here is a true 1/4”.
Original poster, get all your thicknesses right before you start. The process J has detailed is what I have followed with success.