I have a T&G pine ceiling coming up, aand i was wondering what the going rate to supply, install, and finish ( $ per sq. ft) 19′ vaulted ceilings, select pine. About 1200 -1500 sq. ft. Also do you find it easier to finish berfore installing. I’ve never had to finish before.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story

There are important considerations to keep in mind when building a slab-on-grade home with continuous insulation.
Featured Video
Video: Build a Fireplace, Brick by BrickRelated Stories
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Fine Homebuilding Magazine
- Home Group
- Antique Trader
- Arts & Crafts Homes
- Bank Note Reporter
- Cabin Life
- Cuisine at Home
- Fine Gardening
- Fine Woodworking
- Green Building Advisor
- Garden Gate
- Horticulture
- Keep Craft Alive
- Log Home Living
- Military Trader/Vehicles
- Numismatic News
- Numismaster
- Old Cars Weekly
- Old House Journal
- Period Homes
- Popular Woodworking
- Script
- ShopNotes
- Sports Collectors Digest
- Threads
- Timber Home Living
- Traditional Building
- Woodsmith
- World Coin News
- Writer's Digest
Replies
Absolutely pre-finish your material; you'll be way ahead on the whole job. You'll end up missing areas in the joints if you don't. We used to do a bunch of ceilings, and chamfered the butt ends same as the long edges; made for a good look. Wrap a rag around a stick to make a swab for finishing the ends as you go.
Hint: If your framing is on 16's, and you offset every succeeding course two bays from the last, you'll end up with a look that looks random, but uniformly random.
A two-person team is good for this job ... one up with the nail gun, one on the floor over the saw (you can use the sliding compound saw for your end chamfers; no router needed). The up guy should have a two colors of putty in those cute little plastic jars, one for the darker boards, one for the light, for those stubborn boards you just have to face nail. Putty as you go, and you're done.
If you're nailing to bare joists, and don't have a vapor barrier to worry about, beg, borrow, or buy a BoWrench with the T&G accessory. It's a great tool for cranking in crooked boards.
Find a common face width for your material; usually 5-1/8" for 1x6 material. Measure your ceiling to establish a layout so you won't end with a goofy little rip. Snap lines about every 4' parallel to the edge you're going to finish at, so you can adjust for parallel as you go.
Good luck!
Formerly BEMW at The High Desert Group LLC
Oh yeah, the cost. Depends on your market. Five years ago, we could put them up (prefinishing not included; that was the painter's deal) for $2.50 a sq. ft. That was just installation labor covering the two of us.
Formerly BEMW at The High Desert Group LLC
I was thinking closer to 3.10 L&M, unfinished but they should be finished first..
Excellence is its own reward!
Yeah, who knows how things vary place to place. We did a whole flock of these as trim subs. Finished material supplied. We cut 'em, finished the butts, and hung 'em. At $2.50/sq. ($1.25 for each of us), we just paid our hourly rate, and I think we were pretty efficient at it. And again, that's a rate I wouldn't quote if I was still doing it 5-6 years later.Formerly BEMW at The High Desert Group LLC