I am going to be setting 12″ ceramic tiles on a newly poured concrete slab. I’m looking for thoughts on how long I should let the concrete cure before I can set the tile.
Thanks.
I am going to be setting 12″ ceramic tiles on a newly poured concrete slab. I’m looking for thoughts on how long I should let the concrete cure before I can set the tile.
Thanks.
Learn the specific guidelines for location, spacing, and clearance for optimal safety.
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Get home building tips, offers, and expert advice in your inbox
Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.
Start Free Trial NowGet instant access to the latest developments in green building, research, and reports from the field.
Start Free Trial NowDig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.
Start Free Trial NowGet instant access to the latest developments in green building, research, and reports from the field.
Start Free Trial Now© 2025 Active Interest Media. All rights reserved.
Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.
Get home building tips, offers, and expert advice in your inbox
Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.
Start Your Free TrialStart your subscription today and save up to 70%
SubscribeGet complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.
Already a member? Log in
Replies
I think earlier would be better, as it will steal less water from your mortar while it cures.
Thanks for the reply,
i am concerned about moisture transfer from the slab up through the tile. I want the slab to cure properly but not compromise the integrity of the tile grout.
I've never had to rush tile on new slab...............
But I'm thinking something on the bag of thinset says-cured concrete.............
What does that mean in the scheme of things?
Beats me, but there's a forum that deals with TILE-JohnBridge. Check there-might be a whole thread on it.
Best of luck.
Ditto on the John Bridge site!
Ditto on the John Bridge site.
28 Days seems to be the answer.
At least, that's the standard for when they break the cylinders on stuff that has to have a minimum PSI....
-- J.S.
tile on concrete
I am not a expert in the concrete, but just from common sense point of view, just following the recommendation would be good enough. For example, if the concrete installer says the slab will be cured in a month, then wait a month.
One thing I would be thinking about is that concrete slab has a good chance of cracking. Therefore, I would use Kerdi system in case the slab developes cracks.
If you did the pour, go back to the concrete supplier (from truck or bag) and look for recommendation. Hope this helps.
Your biggest concern is that the slab will shrink slightly as it cures. Most of the shrinkage will occur in the first 24 hours, but I'd guess significant shrinkage will occur for a week or so.
Also, of course, the slab will release some excess water, but this is usually done in the first 24 hours.
With 12" tile, though, you need to be concerned about cracks in the slab. A crack isolation membrane of some sort would be worth considering.
Typical wait time would be 28 days for concrete to cure. It will shrink and bonded tiles will then crack and/or pop loose.
I would membrane the slab as well.
I'd recommend two weeks
Generally concrete used for a slab should have a minimum of 3000-psi compressive strength, and 99.9% of the movement should be done after 4-days.
To give a highly accurate answer, I would need to know mix design details, and the data on the concrete as it was placed, and the curing conditions.
The longer it is kept damp the better for ultimate strength.
You need to be careful about what, if any, curing compound was used. Some of them might prevent adhesion of the setting mortar.
I agree with the recommendation for an isolation membrane.
Tile on slab
Concrete needs 28 days to cure. As far as the tiling goes you need to wait at least that long and use Ditra mat as an isolation membrane and it needs to be appled with unmodified thin set morter ( very important ). Good luck
You think in 28 days we'll have come to a consensus?