Working with Habitat for Humanity in RI on a new, 2 story home. The house will be built using ICFs for the foundation perimeter followed by a slab pour. The double sill plates will be fastened using 1/2 J bolts @ 4′ oc
Does the bottom plate of the wall also have to be bolted to to the foundation?