In all the tile books I’ve read I’ve not yet found an answer to my seemingly simple question: do I tile the walls first, or the floor first? I’m planning on using coved base tiles. I’m guessing the walls go first, but I’d love your opinion. If the walls do go first, do I put down my floor backerboard before or after I tile the walls?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story

Discover a concrete-free foundation option that doesn't require any digging.
Featured Video
Video: Build a Fireplace, Brick by BrickHighlights
Fine Homebuilding Magazine
- Home Group
- Antique Trader
- Arts & Crafts Homes
- Bank Note Reporter
- Cabin Life
- Cuisine at Home
- Fine Gardening
- Fine Woodworking
- Green Building Advisor
- Garden Gate
- Horticulture
- Keep Craft Alive
- Log Home Living
- Military Trader/Vehicles
- Numismatic News
- Numismaster
- Old Cars Weekly
- Old House Journal
- Period Homes
- Popular Woodworking
- Script
- ShopNotes
- Sports Collectors Digest
- Threads
- Timber Home Living
- Traditional Building
- Woodsmith
- World Coin News
- Writer's Digest
Replies
I like to do the walls first so any glop I drop doesn't mess up the nice new floor.
-- J.S.
Walls first. Use a 1x4 straight edge screwed to the wall at the height that the sanitary cove base will finish too. Start the wall tile on the straight edge and go up.. After the walls are finished, remove the straight edge and lay the floorhen install the cove on top of the floor. Allow enough height when setting the straight edge for the flor tile thickness and the tile board beneath it.
Dave