Where to solicit bids for floating slab
I don’t know if this is the format or not. I’m contracting a 24×36 garage.
Grade is 17″ difference in the 24′. Buiding inspector says 12″ sidewall a must with 2 #4 rebar stacked.
At bottom of 12″, slab should be flat for 6-8″ before slanting up to the 4″ slab thickness.
Oh yeah, it’s in Independence, MN 20 mi. W of Minneapolis.
INspector also says if garage is to be heated, foam needs to be placed on side and bottom of outer edges of thickened portion of slab.
Thanks in advance.
Replies
Sidewall? Must be a regional term.
Thickened Edge = usually not more than twice the slab thickness.
Stemwall = Concrete wall raised above the slab 6" or more.
Foundation wall (footing) = sits under slab's edge, sometimes on a T footing, sometimes on soil.
Height of Stem wall and foundation wall does not include slab.
SamT
Anyone who doesn't take truth seriously in small matters cannot be trusted in large ones either. [Einstein] Tks, BossHogg.