Foundation Air and Vapor Strategy
Insulation is critical, but a continuous air barrier is just as important.
A few years ago, we began using 15 mil-thick plastic as part of our under slab air and vapor strategy. Plastic that thick may seem like overkill to some, but I’ve remodeled multiple houses where the scope of the project required removing concrete slabs and have seen thin plastic used for a vapor barrier so cracked, brittle, or dissolved that it wasn’t accomplishing anything more than taking up space. Since we are relying on the plastic as part of our air barrier strategy, using the extra-thick poly is worth it, and we’ve seen the results firsthand on previous projects.
The Stego Wrap rolls we purchase are just over 1,900 sq. ft., so one is usually enough for a house. All the overlap joints and pipe penetrations are sealed with their proprietary tape to create as solid an air barrier as possible. The continuous barrier will help prevent vapor diffusion upward from the ground to the concrete.
The plastic is held in place by the pressure-treated 2×6 plate along the perimeter. (As I mentioned in a previous blog post, the 2×6 also prevents the slab edge insulation from rising up during the concrete pour.) Once the exterior walls are framed, we tape the plastic to the Zip System sheathing to continue the air barrier up the outside of the wall.
Fine Homebuilding Recommended Products
Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.
100-ft. Tape Measure
Plate Level
Anchor Bolt Marker