How we found it: 3 layers of cieling and mold, split level tub and sink draining directly into the crawl space, variety of vinyl flooring on floors and walls, pink fixtures, stick on tile bathroom mirror, stucco/drywall/wallboard-beaded panel walls, dead rats and rat nest in the walls, foul odor.
What we did: gut entire bathroom and cieling, new gyproc, subfloor, wiring, wainscotting, replace single window with 2 new windows flanking the sink, new fixtures and plumbing, vaulted tongue and groove cieling, salvaged sink pedastal and used resin sink (the sustainable/budget part of the project).