No work gets finished unless it’s ok’d by the boss
Up Next
Video Shorts
Featured Story
The code requires installing an approved material to slow the spread of fire between floors and adjacent vertical and horizontal cavities — here are the allowed materials and required locations.
Featured Video
Builder’s Advocate: An Interview With ViewrailDiscussion Forum
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Video
View All Videos- FHB Podcast Segment: Old Home Insulation Troubles - How to Find the Right Contractor
- A Closer Look at Pella's Steady Set Window Installation System with Mike Guertin
- FHB Podcast Segment: The Best of the Fine Homebuilding Podcast, Volume 8
- FHB Podcast Segment: Larsen-Truss Retrofit to Existing Stud-Frame House
View Comments
These guy's have lots of great tools, but I'm worried that they have forgot my dog stuff, it may be a long day.