This Bathroom project was part of a renovation and addition for clients in need of more space for their growing family. By reconfiguring an existing office, we gave them a new master bedroom and bathroom with laundry utilities on the main floor, with a 3′ wide hallway connecting the existing home to the new master bedroom. Careful space planning allowed us to create a highly functional space that will mitigate the inconvenience of traveling down an old staircase to do laundry in the basement and also the morning traffic jam in the bathroom.
Up Next
Video Shorts
Featured Story
Skim-coating with joint compound covers texture, renews old drywall and plaster, and leaves smooth surfaces ready to paint.
Featured Video
Builder’s Advocate: An Interview With ViewrailDiscussion Forum
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Video
View All Videos- FHB Podcast Segment: Old Home Insulation Troubles - How to Find the Right Contractor
- A Closer Look at Pella's Steady Set Window Installation System with Mike Guertin
- FHB Podcast Segment: The Best of the Fine Homebuilding Podcast, Volume 8
- FHB Podcast Segment: Larsen-Truss Retrofit to Existing Stud-Frame House